The data of wind energy resources are analyzed, and the most favorable address is selected for pre-planning and operation, so as to obtain the maximum output of the whole and improve the economy of power supply. Then the site selection results are comprehensively evaluated by integrating topography, geology, transportation, power grid and external conditions.
When choosing a site, you should know the local laws and policies and the requirements of the site. We must pay attention to the problem of potential safety hazards, determine the distance of safety isolation, comprehensively evaluate the project construction cost, and ensure the best economy of the whole life cycle of wind power financial products.
Comprehensive consideration of geographical, technological, economic and environmental factors. There must be a deviation between the evaluation of wind energy resources and the operation after actual construction. Design companies need to summarize and review the projects again and again to find the optimal algorithm model in order to obtain a higher technical level.
The steps and calculation methods of macro-location are rough, which need to be supplemented by micro-location technology. The macro-location is a region, and the specific location of aircraft seats needs deeper data analysis and research.
Many power generation units ignore the importance of pre-wind resource assessment and perfunctory the pre-wind estimation work, but they do not know that if enough resources are invested in the pre-wind, whether onshore wind power or offshore wind power, the more accurate the location of the aircraft, the greater the economic benefits will be in the future.
Especially for offshore wind power, if the preliminary investigation is not in place, it will not only cause the loss of income in the project commissioning stage, but also cause huge cost waste in the early project construction stage, which will greatly increase the project recovery cycle of the whole financial product. Even when the wind power generation technology and equipment reach the service life, the overall project has not yet achieved profitability.
Hainan Electric Network, Hainan Electric